Hiring a demolition contractor is not something most people do often, and the choice affects safety, timelines and cost. Whether you’re knocking down an old home to rebuild or clearing land for a fresh start, a few checks before you sign can save you delays and unexpected costs.
This guide covers what to consider and what to ask. If you’d like to get organised first, see what to prepare before hiring a demolition contractor.
Licensing
Demolition work in Queensland is licensed through Workplace Health and Safety Queensland, and asbestos removal needs a Class A or Class B licence. Ask for the licence numbers and check them against the WHSQ register. A professional contractor will give them to you without hesitation. See why choose a licensed demolition company in Brisbane.
Insurance
Check that the contractor has current public liability insurance and that the cover suits the size of your project. Ask for a certificate of currency. If there’s hesitation or delay in providing it, consider that a warning sign. See what insurance you need before a house demolition in Brisbane.
Experience
Residential demolition needs different skills from commercial or industrial work, particularly around council requirements, access and protecting neighbours. Ask what types of demolition they regularly do, whether they’ve worked on similar properties or site conditions, and how they would approach yours. Read reviews, and ask for examples of recent work and how they handled challenges.
The Quote
Ask for a written quote that sets out what’s included. Check whether it covers permits and approvals, service disconnections, asbestos inspection and removal, waste removal and site clean-up. If something isn’t listed, it may not be included. Be cautious of vague pricing, or a quote given without a site inspection. See how to compare quotes from demolition companies in Brisbane and how much house demolition costs in Brisbane.
Asbestos
Older homes often contain asbestos, so ask how it will be managed: whether an inspection is included, who does the removal and how it is handled and disposed of. Licensed removal is required for any friable asbestos and for more than 10 square metres of bonded asbestos. See asbestos and house demolition and our asbestos removal service.
Timeline and Availability
Confirm the contractor can meet your timeline. To give you a date, they’ll need the size of the structure, the materials used, the condition of the foundation, any extras such as a pool, and how easily machinery can reach the site. Ask when work can start, how long it will take and what could affect it, such as weather or approvals. A good contractor gives a realistic timeframe, not an overly optimistic one. See how long a house demolition takes in Brisbane.
Site Management and Safety
Ask how access will be controlled, what equipment will be used, how safety risks will be managed and how neighbouring properties will be protected. This matters most in suburban areas where homes are close together. A contractor with a clear plan limits disruption and the risk of damage. See how demolition companies protect neighbouring homes and businesses.
Waste and Clean-up
Demolition isn’t finished when the structure comes down. Ask whether all debris will be removed, whether materials are sorted and recycled where possible, and how waste is disposed of. Site clearing can be a significant cost, so check it’s in the quote. See how demolition waste is sorted and recycled.
Communication
Ask who your main contact will be, how updates will be given and how changes will be communicated. A contractor who communicates clearly from the start is more likely to manage the project well.
Get It in Writing
Before work starts, get everything in writing. The contract should set out the work to be done, the timeline and a payment schedule. It should also show the costs for demolition, assessment, clean-up and debris disposal, and say which permits and approvals the contractor will arrange.
Questions to Ask a Demolition Contractor
- What types of demolition do you regularly do?
- Can you give me your licence numbers and a certificate of currency?
- What does the quote include, and what does it leave out?
- How will you manage asbestos?
- When can you start, and how long will it take?
- How will you protect neighbouring properties?
- Where does the waste go?
- Who will be my main contact?
Choosing a Contractor You Can Check
Next Gen Demolition carries out house demolition across Brisbane and the Gold Coast. We are licensed and insured, and we hold Class A and Class B asbestos removal licences. Contact us for a free quote.
